NTBA provided surveying services for an 8" gas pipeline route from an existing pipeline tie-in point through 2 existing well sites. The scope consisted of determining the location, size, type, owner, and depth of all existing pipelines along with any natural or man-made features which affected the proposed route. A subsequent topographic and boundary survey was performed to create plats for each landowner and line drawings (Construction Alignment Sheets) for the client and construction contractor. Final Quality Assurance reviewed all deliverables, the pipeline route was staked for construction, and a final walk through was performed to verify accuracy.